featured graphic for I-405 Improvement Project after COVID-19. Logo courtesy of OCTA.

SB I-405 closures for Fairview Road bridge work

Crews will continue installing wooden and concrete work platforms, as well as mobilizing equipment to continue construction of the Fairview Road bridge over I-405.

This work requires freeway and ramp closures.

SB I-405 will be closed between Fairview and SR-73 11 p.m. to 5 a.m.:

  • Monday, Aug. 16; and
  • Tuesday, Aug. 17.

Sign up for project-wide and bridge-specific construction alerts at bit.ly/405-signup.

This article was released by the Orange County Transportation Authority.