featured graphic for Long Beach Airport (LGB) after COVID-19

Runway closures at Long Beach Airport through Nov. 10

Starting tonight (Monday, November 8), our primary runway, Runway 12/30, will be closed nightly Monday through Wednesday (November 10) from 10:00 p.m. until each following morning at 6:15 a.m. due to construction activities being conducted in the runway safety area of Runway 12/30. During these times, Runway 08L/26R will be in use.

Nighttime operations will resume on Runway 12/30 on Thursday, November 11.

This article was released by the Long Beach Airport.