Bright Canyon Energy

featured graphic for the JFTB's energy resilience project groundbreaking

Joint Forces Training Base Los Alamitos held a long-awaited groundbreaking ceremony for its Energy Resilience Project, a major step forward for the Army Climate Strategy, which aims to build a microgrid on every installation by 2035. The 100-acre microgrid at JFTB Los Alamitos is expected to be completed by summer …continue reading

The Army executed a 30-year lease with Bright Canyon Energy (BCE) for a privately funded, owned and operated energy resilience project on approximately 100 acres at Joint Forces Training Base – Los Alamitos (JFTB-LA), CA. Construction is expected to begin this summer. The project will provide power to JFTB-LA critical …continue reading